The purpose of Parts Per Hour is to calculate and display the an ongoing target for good parts based on the operation time.  Using operation times, it is possible to display the expected parts per hour for a specific part and machine combination.  To start, operation times need be assigned to the machine and part combination. 



Parts per Hour Report


The Parts Per Hour report displays parts per hour data from a specified data range.  The report details what the Parts Per Hour metrics occurred in between a part start and part end.

This report is used to dig deeper into what the expectation of parts being made was versus the actual amount of parts that were made.


More Information about the set-up can be found about parts per hour here.


Required and Optional Information


A time frame and one and one or more pieces of equipment and a part are required to generate the Report.  By default, Today is selected for the time frame. Additional options on how to display the data can be selected by pressing the Next button. Press the Finish button to run the report. 


After pressing the next button you can define the location where the export will be saved.