Manage Shift Equipment
Previous Topic  Next Topic 


Assigning Equipment to Shifts


The Shift Equipment form only needs to be used when there are overlapping shifts.  In this case the equipment must be assigned to a specific shift to allow DataXchange to know which active shift to associate the data to.


To assign equipment to a specific shift group select the Shift Group from the drop down and then select the Equipment or Equipment Group and use the arrow buttons to move the equipment to the Selected window. 


Press the Enter button to save the changes.


Equipment can only be assigned to one Shift Group.